Washtucna YTB-826
Washtucna
(YTB-826: dp. 356 (f.) ,1. 109'; b. 31'; dr. 14' (max.);
s. 12.0 k.; cpl. 12; cl. Natick)
Washtuena (YTB-826) was laid down on 1 May 1973 at Marinette, Wis., by the Marinette Marine Corp.; launched on 9 October 1973, and delivered to the Navy on 11 December 1973. Placed in service at San Diego Calif., soon thereafter, Washtuena performed local and coastal towing tasks for the 11th Naval District into 1978.