USS Summit

Navyhistory.com
ABOUT US
History of Ships and Navies
Contact US
Navy Links

Ê

Other Sites
HistoryShopping.com
Navalshopping.com
Historycentral.com
America's Wars
Revolutionary War
War of 1812
Civil War
World War II
Ê US Aircraft of WW2
Vietnam War
Presidential Elections
NationbyNation.com
Multieducator Products

Summit AMC-106

Mug Windbreaker
Plaque Cap
Polo Shirt Sweatshirt
Summit

(AMC-106: dp. 195; 1. 98'5; b. 23'6; dr. 10'8; B.
10 k.; cpl. 17; a. 2 .50 cal. mg., 2 .30 cal. mg.; cl.
Acme)

Summit (AMC-106) was laid down on 24 March 1941 by the Snow Shipyards Co., Rockland, Maine; launched on 20 September 1941, sponsored by Miss Louise Dey; and commissioned on 29 January 1942.

Summit proceeded to Yorktown, Va., with Stalwart (AMC-105) for a 10-day training period with the Mine Warfare School. They arrived on 25 February and, upon completion of training, were routed onward to Key West, Fla., for duty in the 7th Naval District. Summit arrived there on 16 March 1942 and served that district until June 1945.

Summit was reassigned to the Naval Auxiliary Air Station, Mayport, Fla., on 30 June. Her minesweeping equipment was removed, and she was detailed to duty in connection with aviation duty as a target towing ship. Her designation was changed from AMC-106 to IX-232 on 10 August. In November, she was ordered to the Naval Air Station, Pensacola, and reported there, on 13 December 1945, for duty with the Naval Air Training Command.

Summit was found to be in excess of Naval requirements in May 1946 and was decommissioned on 28 May. She was struck from the Navy list on 29 October 1946.
hjk